Appointed to produce an expert delay report for an LCIA arbitration case relating to an onshore early production facility in the Middle East. The proposed 150,000 barrels of oil per day scheme included oil and gas gathering systems and pipelines, and associated sulphur handling and granulation plant. Report addressed matters relating to planning and programming with respect to the critical path and delays that occurred on the project, which was terminated during the detailed design stage.